8. System Setting Procedure

8.1System Setting Screen

The following is an explanation of the items found in the System Settings window.

Maintenance group

User Set-up

group

System Set-up

group

Initial window

Function group

Function

Operation details

 

 

 

 

 

 

 

User set- up

Allow or disallow certain functions

[User Set- up group]

Site name set- up

Set the building name

 

 

 

 

Password set - up

The password can be changed

 

 

 

 

G- 50A connection set-up

Sets the number of G-50A units connected and the IP address.

 

 

 

 

System configuration set-up

Sets the system configuration, group, interlocking unit, etc.

 

Monitoring screen set-up

Executes the model name setting, plane drawing creation, group icon

[System Set-up group]

 

arrangement, etc.

 

 

 

Watt hour meter set- up

Set the watt hour meter serial port and watt hour meter address

 

 

 

 

Energy monitoring set-up

Set the system billing function

 

 

 

 

Time set- up

Set the current time

 

Maintenance of charge data

Proportional billing information can be revised .

 

 

 

[Maintenance group]

Operation amount data

Operation amount data stored in G-50A can be monitored and saved.

monitor

 

 

Remedial apportioning

Remedial apportioning can be tentatively performed when charging

 

setting

trouble o c c u r s .

 

 

 

Note:

See Chapter 9 for the maintenance group items.

The set items that are displayed depend on the functions of the TG -2000A purchased.

Displays the operation contents of the select buttons on each setting screen.

Buttons

Operation contents

[OK]

Validates the contents set on this display screen to advance to the next setting screen.

(Advances to the next setting screen if it is the preparation screen . )

 

[Next]

Advances to the next setting screen .

 

 

[Back]

Invalidates the contents set on this display screen to return to the last screen.

[Cancel]

Invalidates the contents set on this display screen to shift to the initial screen.

 

 

8.2System Setting Procedure

The following is an explanation of the System Settings performed at the Initial window.

When no System Settings exist

User set-up ￿ Site name set -up￿ G-50A connection set-up ￿ System configuration set-up￿Monitoring screen set-up ￿ Watt hour meter set-up ￿ Energy monitoring set-up (Password set-up ￿ Time set-up)

22

Page 25
Image 25
Mitsubishi Electronics TG-2000A operation manual System Setting Procedure System Setting Screen