9.Charge Data Correction and Remedy
9.1Result of
Table:Assumed cases and recovery method (For Without WHM connection proportionally divided power charge (manual input of the electric amount))
A s s u m e d c a s e | Air - conditioning energy | Charging data status | C o r r e c t i o n m e t h o d | |
m o n i t o r i n g s c r e e n | ||||
|
|
| ||
|
|
|
| |
|
|
|
| |
PC failure | (Display impossible) | Charging data destroyed | Operation amount data monitor | |
(HDD failure) |
|
| + Charging parameter output | |
|
|
| + Charging data maintenance | |
|
|
| *1 | |
|
|
|
| |
PC failure | Red characters (abnormal) | Forwarded to next day and apportioned | No repair is required. | |
|
| to recovery day | *2 | |
G- 50A communication | Red characters (abnormal) | |||
(Collected for several days and |
| |||
error |
| apportioned) |
| |
|
|
| ||
|
|
|
| |
G- 50Amain unit failure | Black characters (normal) | Apportioned, but data is not correct | Charging data maintenance | |
|
| (Interval: Error day ~ recovery data) |
| |
|
|
|
| |
System information | Black characters (normal) | Apportioned based on set information | Charging data maintenance | |
setting error |
|
|
| |
|
|
|
|
*1 : For repair, the operation amount for the repair period is monitored to output the CSV file upon the output of the charge parameter. The proportional division parameter is found by calculating it from the values of the difference and the capacity. The parameter is input through the charge data maintenance, by which the charge data can be repaired.
*2: When a forwarding that extends past the
Note:
•If there are two or more assumed cases, make overall judgment.
•When forwarding of apportionment spans the settlement
•The charge data status is irregularly processed according to the case which occurred.
Table:Assumed cases and recovery method (For With WHM connection proportionally divided power charge (direct fetching of the electric amount to the PC))
A s s u m e d c a s e | Air - conditioning energy | Charging data status | C o r r e c t i o n m e t h o d | |
m o n i t o r i n g s c r e e n | ||||
|
|
| ||
|
|
|
| |
|
|
| ||
PC failure (HDD failure) | (Display impo | Charging data destroyed | Remedial apportioning | |
| ssible) |
|
| |
|
|
|
| |
PC failure (with backup) | Red characters (abnormal) | Charging data is abnormal and cannot | Remedial apportioning | |
|
| be apportioned |
| |
Watt hour meter failure | Red characters (abnormal) |
| ||
(Interval: Last backup day ~ recovery day) |
| |||
(Monitoring impossible) |
|
|
| |
|
|
|
| |
Watt hour meter failure | Red characters (abnormal) | Forwarded to next day and apportioned | Charging data maintenance | |
(Monitoring possible) |
| to recovery day |
| |
|
| (Data may not be correct) |
| |
|
|
|
| |
G- 50A communication | Red characters (abnormal) | Forwarded to next day and apportioned | (Unnecessary) | |
error |
| to recovery day | *1 | |
|
| (Collected for several days and apportioned) |
| |
|
|
|
| |
Black characters (normal) | Apportioned, but data is not correct | Charging data maintenance | ||
|
| (Interval: Error day ~ recovery data) |
| |
|
|
|
| |
Calculation unmatch | Black/red characters | Irregular processing performed and | (Unnecessary) | |
| (Normal/abnormal) | apportioned or forwarded to next day | *1 | |
|
|
|
| |
System information | Black characters (normal) | Apportioned based on set information | Charging data maintenance | |
setting error |
|
|
| |
|
|
|
|