Wizard name

Primary settings contained in the activated window

Preparation for Energy monitoring

Verifies the order of billing settings and displays warnings .

set -up

 

Model name

Sets the unit model No.

Number of floors, and floor name

Set floor number and names .

Floor plane drawing

Create a floor plane to be used in the floor window of the

 

Management window.

 

 

Relation between floor and G-50A

Sets the number of G-50A terminals.

Group icon placing and naming

Layout icons on the floor plane, and set names .

Operation block setting

Set groups in blocks.

Wizard name

Primary settings contained in the activated window

Maintenance of charge data

Dat a for the last 62 days from the watt hour meter, indoor units,

(Present value monitor)

and outdoor units can be viewed and edited.

 

(Also, current values for watt hour meters can be monitored.)

Maintenance of charge data

Watt hour meter data from the last 62 days can be viewed and

(Meter maintenance)

edited.

 

 

Maintenance of charge data (Unit)

Data for the last 62 days from indoor units and outdoor units can

 

be viewed and edited.

Wizard name

Primary settings contained in the activated window

Operation amount data monitoring

Operation data stored in G-50A can be monitored and saved.

Wizard name

Primary settings contained in the activated window

 

 

Remedial apportioning setting

Remedial apportioning can be tentatively performed when

 

charging trouble occurs.

19

Page 22
Image 22
Mitsubishi Electronics TG-2000A operation manual