Contents

1.

Safety Precautions

1

8.8 Watt Hour Meter Set-up

40

 

 

 

 

 

 

8

.8

.1

Setting Procedures and Restrictions

40

2.

System Requirements

2

8

.8

.2

Watt Hour Meter Setting (Step 1)

40

 

2.1

 

Requirements (system recommendations)

2

8

.8

.3

Set- up for the Name and the Maximium

 

2.2

 

Compatible units

2

 

 

Integrated Value of WHM (Step 2)

41

 

2.3

 

Restrictions

3

8.9

Energy Monitoring Set-up

42

 

2.4

 

Other devices

4

8

.9

.1

Setting Procedures and Restrictions

42

 

 

 

 

 

 

8

.9

.2

Division Mode (Step 1)

43

3.

System Configuration

5

8

.9

.3

Relation between Outdoor Units and

 

 

3.1

 

System Configuration Example

5

 

 

Watt Hour Meter (Step 2)

43

 

3.2

 

Hardware Connection Diagram

5

8

.9

.4

Electrical Specification of Outdoor Units

 

 

 

 

 

 

 

 

 

(Step 3)

44

4.

Flow of Site Adjustment

6

8

.9

.5

Relation betw een Indoor Units and

 

 

4.1 Flow of Site Adjustment

6

 

 

Watt Hour Meter (Step 4)

45

 

4.2 Tools for Site Adjustment

6

8

.9

.6

Electrical Specification of Indoor Units

 

4.3

 

Step 1: Test operation from central controller

 

 

 

(Step 5)

46

 

 

 

 

G-50A

7

8

.9

.7

Charge Block (Step 6)

46

 

4.4

 

Step 2: Initial setting of integrated centralized

8

.9

.8

Currency Unit Set (Step 7)

48

 

 

 

 

control software TG-2000A

7

8

.9

.9

Charge Set (Step 8)

48

 

4.5 Step 3: Test operation from integrated centralized

8

.9

.10

Standard Charge Set

49

 

 

 

 

control software TG-2000A

8

8.10 Time Set-up

50

5.

Installation

.......................................................

9

8.11 Password Change

52

 

 

 

 

 

 

 

5.1

 

Pre-installation Steps

9

9. Charge Data Correction and Remedy

53

 

5.2

 

TG-2000A Setup

9

9.1 Result of Air-conditioning Charge Calculation

53

 

 

5

.2.1

Setup

9

9.2 Maintenance of Charge Data

55

 

 

5

.2.2 Running TG-2000A Setup (New setup)

10

9

.2

.1

Preparing for Charging Data Maintenance...

55

 

5.3

 

TG-2000A Uninstall

12

9

.2

.2

Maintenance Methods and Restrictions

55

 

 

 

 

 

 

9

.2

.3

Unit Data Maintenance

56

6.

Part Names and Functions

13

9

.2

.4

Watt Hour Meter Data Maintenance

59

 

6.1

 

Window Elements

13

9

.2

.5

Verfy Test Operation of Watt Hour Meter....

60

 

6.2

 

Basic Mouse Operation

14

9.3 Operation Amount Data Monitoring

60

 

6.3

 

Accessing Functions and Moving between

9.4

Charge Parameter Output

61

 

 

 

Windows

14

9.5

Charging Remedy

62

 

 

 

 

 

 

9

.5

.1

Preparing to Perform Charging Remedy

63

7.

Initial Startup and Shutdown

20

9

.5

.2

Remedial Apportioning Setting Screen

64

 

7.1

 

Before startup

20

9

.5

.3

Remedy when personal computer HDD

 

7.2

 

Startup

20

 

 

 

fails (no backup)

66

 

7.3

 

Shutdow n

21

9

.5

.4

Remedy when personal computer HDD

 

 

 

 

 

 

 

 

 

fails (backup)

67

8.

System Setting Procedure

22

9

.5

.5

Apportioning method when computer

 

8.1

 

System Setting Screen

22

 

 

 

crashes

69

 

8.2

 

System Setting Procedure

22

9

.5

.6

Remedy when watt hour meter fails

 

 

8.3

 

User Set-up

23

 

 

 

(monitoring impossible)

70

 

 

8

.3.1

General Operation

23

9

.5

.7

Remedy for system information setting error 72

 

 

8

.3.2

Connection Setting

24

 

 

 

 

 

 

 

8

.3.3

Reliability Function

24

10. Error Code List

74

 

 

8

.3.4

Energy Monitoring Related

25

 

 

 

 

 

 

8.4

 

Site Name Set-up

25

11. Setting Check List

78

 

8.5

 

G-50A Connection Set-up

27

11.1 Setting Check List

78

 

 

8

.5.1 Setting Procedure and Restrictions

27

11.2 Test Run Check

79

 

 

8

.5.2

Number of G-50A (Step1)

27

11.3 Charging Test Run Check

82

 

 

8

.5.3

G-50A IP Address Set-up (Step 2)

27

11.

3.1 Charging (No WHM connection)

 

 

8.6

 

System Configuration Set-up

28

 

 

 

Test Run Check

82

 

 

8

.6.1 Setting Procedure and Restrictions

28

11.

3.2 Proportionally Diveded Power Charge

 

 

8

.6.2

G-50A Data Collecting (Step 1)

29

 

 

 

(RS-485 WHM connection) Test Run Check 86

 

 

8

.6.3. Unit Co mposition Set-up (Step 2)

29

 

 

 

 

 

 

 

8

.6.4. Set-up of Refrigerant System (Step3) .... 31

 

 

 

 

 

 

 

8

.6.5 Set-up of Group (Step4)

32

Appendix 1 : Installing Windows XP Professional

91

 

 

8

.6.6

Interlocked setting(Step 5)

33

Appendix 2: Auto Log-in Confirmation Method

93

 

8.7

 

Monitoring Screen Set-up

34

Appendix 3: Correction to Charge Calcution in the Event

 

 

8

.7.1 Configuration Procedure and Restrictions ...

34

 

 

of G-50AReplacement due to Fault

94

 

 

8

.7.2

Set-up of Model Name (Step1)

34

 

 

 

 

 

 

 

8

.7.3

Set- up of the Number of Floors,

 

 

 

 

 

 

 

 

 

 

and Floor Name (Step2)

35

 

 

 

 

 

 

 

8

.7.4 Creation of a Plane View (Step 3)

36

 

 

 

 

 

 

 

8

.7.5 Set-up of Floor Name and G-50A(Step 4) ...

36

 

 

 

 

 

 

 

8

.7.6

Set-up of IIon arrange and Name (Step 5)...

37

 

 

 

 

 

 

 

8..7.7 Set-up of Block(Step 6)

38

 

 

 

 

 

Page 2
Image 2
Mitsubishi Electronics TG-2000A operation manual Contents