Mitsubishi Electronics TG-2000A operation manual

Models: TG-2000A

1 98
Download 98 pages 35.83 Kb
Page 11
Image 11

4.5Step 3: Test operation from integrated centralized control software TG-2000A

Perform the test operation from the integrated centralized control software TG-2000A to check the operation state and monitor display of the air conditioner.

For the operation procedure, refer to the Instruction Manual (Management).

Note:

For confirmation in the test operation, use the checklist shown in Chapter 11.

Perform the normal operation from the integrated centralized control software TG -2000A to execute the test operation/confirmation. (The test operation function is not included in the start/stop function.)

8

Page 11
Image 11
Mitsubishi Electronics TG-2000A operation manual