9.5.1 Preparing to perform charging remedy

Settlement-of

Settlement-of

Settlement-of-

 

accounts day

accounts term

accounts end day

Remedial apportioning simply apportions the

entire

 

 

 

 

 

 

un-apportioned part and calculated the air-conditioning

 

 

 

 

 

 

charge using the normal apportioning data. For remedial

Failure generation

Failure recovery

apportioning,

 

 

 

ê

 

 

ó

 

• Settlement -of-accounts term

 

 

 

 

 

 

Normal

<Remedial a

 

Normal

Apportioning interval

 

 

 

pportioning interval>

• Total billing air-conditioning charge

 

Normal

 

Remedial

 

Normal

Failure day watt hour meter integrated value

 

 

apportioning +

apportioning

+ apportioning

 

 

 

Operation data monitoring must be prepared or performed.

To perform the charging remedy, the items for each assumed case are shown below. V shows that the remedy is required.

 

 

 

Assumed case

 

 

 

 

 

 

 

 

 

 

 

Item

att hour

 

 

 

System

Remarks

 

meter failure

HDD failure

HDD failure

Computer

 

 

information

 

 

 

(Monitoring

(no backup)

(backup)

c r a s h

 

 

 

setting error

 

 

 

impos sible)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Settlement-o f-

V

V

V

V

V

Essential

 

accounts term

 

 

 

 

 

 

Preparation

R e m e d i a l

V

V

V

V

V

Essential

apportioning

 

 

 

 

 

 

interval

 

 

 

 

 

 

 

 

 

 

 

 

 

Total billing

V

V

V

V

V

*1

a m o u n t

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wa tt hour meter

(V)

V

 

 

 

 

 

integrated value

*2

 

 

 

 

 

 

for failure day

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Implementation

Operation amount

 

V

V

V

 

See sec .

 

 

 

 

 

9.3

data monitoring

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

R e m e d i a l

V

V

V

V

V

See s e c .

 

 

 

 

 

9 .5 .2

apportioning

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*1 When there is one tariff, preparations are unnecessary.

*2 When replacing a watt hour meter, study the watt hour meter integrated value for the day the failure was thought to have occurred.

Note:

This remedial apportioning simply calculates the air-conditioning charge. It cannot recover to normal apportioning.

When the s ettlement -of-accounts term is one month, the air-conditioning charge including the standard charge can be calculated.

When the operation amount data must be monitored, do it before remedial apportioning.

This function cannot be used for Without WHM connection proportionally divided electric charge.

63

Page 66
Image 66
Mitsubishi Electronics TG-2000A operation manual Preparing to perform charging remedy, Preparation