Watt hour meter air-conditioning charge result

Note:

Perform remedial proportioning from the day after the settle-of-accounts day. However, except when it is different from the normal settlement -of-accounts term. Remedial apportioning can begin two days after the recovery day. (Only when the day after the recovery day was normally charged.)

7)Settlement -of-accounts term setting

Set the settlement-of-accounts term (start day and end day) at the remedial apportioning setting screen. The initial value is the settlement-of-accounts term of the previous month.

8)Total air-conditioning charge setting

Set the total air-conditioning charge for the settlement - of-accounts term.

Note:

When the settlement-of-accounts term is one

month and includes a standard charge, set the

Remedial apportioning setting window

total air-conditioning charge including this

 

standard charge.

 

When there is one power charge (no time setting), the total air-conditioning charge does not have to be set. This item appears in gray.

9)Include/Not include standard charge setting

When the settlement-of-accounts term is one month, [Include] or [Not include] standard charge can be selected. Set whether or not the standard charge is to be included.

10)Remedial interval setting

Set the remedial apportioning interval. The remedial start day is the settlement-of-accounts start day and the remedial end day is the settlement -of-accounts end day.

Note:

“Recovery day” is the day the system was recovered from an HDD failure and normal operation was restarted.

11)Watt hour meter integrated value setting

Set the watt hour meter integrated value of each watt hour meter from the air-conditioning charge result (watt hour meter) for the month before last. The watt hour meter calculated result for the month before last is the watt hour meter integrated value for the last day. Use that value.

The watt hour meter integrated value for all the watt hour meters must be corrected and input. When the integrated value data changes, the display turns blue. The initial value before correction and input is a blank display.

When setting of the remedial apportioning screen is complete, perform section 9.5.2 “(3) Calculate remedial apportioning” .

9.5.4 Remedy when personal computer HDD fails (backup)

The following describes the remedy when the computer HDD fails and the charge data is backed up.

1)HDD recovery

Recover from personal computer HDD failure by replacing the HDD, etc. and install the necessary OS.

2)TG-2000A installation

Install TG-2000A MSDE, database, and this program. Refer to the setup method and install.

3)System configuration and charging system restoration

Install the database backing up the air conditioning system configuration, charging system, charging data, etc.

Note:

For the specific procedure, consult your distributor or sales company.

67

Page 70
Image 70
Mitsubishi Electronics TG-2000A operation manual Remedy when personal computer HDD fails backup