C. Crane A-66 manual Installation

Models: A-66

1 56
Download 56 pages 31.91 Kb
Page 24
Image 24

INSTALLATION

Optipay™CC

Section5

6.Connect the Coin Changer to the Vending Machine using the MDB connecting cable (See Figure 5-1 [1]).

NOTE: A second Harness containing a four pin connector is used with the optional DBV-301 Validator’s RC-10 Recycling Unit. This should be tied off if not being used.

7.Reconnect the Vending Machine’s main AC power supply. The three LEDs (See Figure 5- 1 [2]) located on the Coin Validator’s front panel will briefly illuminate to test their functions. Afterwards, the Green LED should remain lit. The Coin Changer is now operational and ready for use.

5900335 © 2005 JCM-American Corporation

5 - 2

Page 24
Image 24
C. Crane A-66 manual Installation