LEGEND
AL | — Alarm Relay |
BC | — Blower Contactor |
CB | — Circuit Breaker |
CC— Compressor Contactor
CO | — Sensor, Condensate Overflow |
DPP | — Dual Point Power |
DS | — Disconnect Switch |
FP1 | — Sensor, Water Coil Freeze Protection |
FP2 | — Sensor, Air Coil Freeze Protection |
HP | — |
HPWS | — |
JW3 | — Clippable Field Selection Jumper |
LOC | — Loss of Charge Pressure Switch |
MV | — Motorized Valve |
PDB1 | — Power Distribution Block |
PDB2 | — Power Distribution Block Dual Point Option |
RVS | — Reversing Valve Solenoid |
TRANS — Transformer
Factory Line Voltage Wiring
Factory Low Voltage Wiring
Field Line Voltage Wiring
Field Low Voltage Wiring
Printed Circuit Trace
Optional Wiring
13
Relay/Contactor Coil
Thermistor
Condensate Pan
Circuit Breaker
Ground
Solenoid Coil
Relay Contacts - N.O.
Relay Contacts - N.C.
Temperature Switch
Switch - Low Pressure
Switch - High Pressure
Wire Nut
NOTES:
1.Compressor and blower motor thermally protected internally.
2.All wiring to the unit must comply with NEC (National Electrical Code, U.S.A.) and local codes.
3.
4.FPI jumper provides low temperature protection for WATER. When using ANTIFREEZE solu- tions, cut JW3 jumper.
5.Typical heat pump thermostat wiring shown. Refer to thermostat installation instructions for wir- ing to the unit. Thermostat wiring must be “Class 1” and voltage rating equal to or greater than unit supply voltage.
6.
7.Transformer secondary ground via Complete C board standoffs and screws to control box. (Ground available from top two standoffs as shown.)
8.For dual point power option, blower wires (3 qty) will go to PDB2 only.
Complete C