Install the Door Control
1.5 Position the bottom hole of the door |
| 1.6 Lift the push bar and mark the top |
control over the screw and slide |
| hole. |
down into place. |
|
|
|
|
|
2 Wire the door control to the garage door opener
|
|
|
|
| 2.1 Run the white and red/white wire | ||||
| HARDWARE |
|
|
| |||||
|
|
| |||||||
|
|
|
|
|
| from the door control to the garage | |||
|
|
|
|
| |||||
Insulated Staple (30) |
|
|
|
| door opener. Attach the wire to the | ||||
|
|
| wall and ceiling with the staples (not | ||||||
|
|
|
|
|
| applicable for gang box or | |||
|
|
|
|
| |||||
|
|
|
|
|
| installations). | |||
|
|
|
|
| |||||
the door control to the garage door opener |
|
|
|
|
| ||||
make sure you use the same wires that are |
|
|
|
|
| ||||
connected to the door control. |
|
|
|
| |||||
|
| Staple | |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Do not pierce the wire with the staple as this | |||
|
|
|
|
|
| may cause a short or an open circuit. |
| ||
|
|
|
|
|
|
|
|
|
|
1.7Remove the door control from the wall and drill a 5/32 inch (4 mm) hole for the top screw.
2.2Strip 7/16 inch (11 mm) of insulation from the other end of the wire near the garage door opener.
7/16"
(11 mm)
1.8Position the bottom hole of the door control over the screw and slide down into place. Attach the top screw.
DRYWALL
DrywallAnchor
GANG BOX
2.3Connect the wire to the red and white terminals on the garage door opener.
GREY
WHITE
WHITE
DRE
To insert or remove the wires from the terminal, push in the tab with a screwdriver tip.
22