Chapter 2 Switch Installation

Installing the Switch

Figure 2-7 Inserting the Rubber Plugs

1

2

Rubber plug

3 Power supply-side mounting position

Cable-side mounting position

Step 3 Use a screwdriver or pen to completely push in the rubber plugs. Figure 2-8shows a close-up of the rubber

plug and how they are inserted into the mounting holes.

Cisco CGS 2520 Hardware Installation Guide

 

78-19377-02

2-9

 

 

 

Page 31
Image 31
Cisco Systems CGS252016S8PC manual Inserting the Rubber Plugs