C-2
Cisco CGS 2520 Hardware Installation Guide
78-19377-02
Appendix C Configuring the Switch with the CLI Setup Program
Accessing the CLI Through the Console Port
Figure C-1 Connecting the Console Cable
Step 3 Configure the baud rate and character format of the PC or terminal to match the console port
characteristics:
9600 baud
8 data bits
1 stop bit
No parity
None (flow control)
Step 4 Connect power to the switch as described in Power Supply Installation, page 3-1
Step 5 The PC or terminal displays the bootloader sequence. Press Enter to display the setup prompt. Follow
the steps in the Completing the Setup Program, page C-7.
1RJ-45 console port 2Console cable (RJ-45-to-DB-9 adapter cable)
207536
2
1
1