Chapter 2 Switch Installation

Installing the Switch

Figure 2-5 Attaching Brackets for 19-Inch Racks

1

2

Phillips flat-head screws

3

Power supply-side mounting position

Cable-side-mounting position

Attaching Brackets for 19-Inch Racks (IP-30 Compliance)

Before installing the mounting brackets, you need to install the rubber plugs into the unused mounting holes of the switch chassis. You can get the appropriate rubber plugs by ordering kit CGS-2520-IP30KIT.

Follow the procedure below to install the rubber plugs.

Step 1 Determine whether you will install using the mid-mount, cable-side, or power supply-side positioning by identifying your bracket mounting positions shown in Figure 2-9and Figure 2-10.

Step 2 Insert the rubber plugs into the appropriate holes according to your mount position as shown in Figure 2-6and Figure 2-7. Follow the same procedure for both sides of the switch.

Cisco CGS 2520 Hardware Installation Guide

 

78-19377-02

2-7

 

 

 

Page 29
Image 29
Cisco Systems CGS252016S8PC manual Attaching Brackets for 19-Inch Racks IP-30 Compliance