
Contents
| C H A P T E R 2 | Switch Installation  | 
 | 
| 
 | Warnings  | 
 | 
| 
 | Installation Guidelines | |
| 
 | Verifying Switch Operation  | |
| 
 | Installing the Switch | |
| Mounting into a Rack | 
 | 
 | |
| .Mounting Brackets | 
 | 
 | |
| Attaching Brackets for  | |||
| Attaching Brackets for  | |||
| Attaching Brackets for  | |||
| Attaching Brackets for ETSI Racks | |||
| Mounting the Switch into a Rack | 
 | ||
| 
 | 
 | 
 | 
 | 
| Attaching Brackets for Wall Mounting | |||
| Installing and Removing SFP Modules  | 
 | 
 | |
| Installing SFP Modules | 
 | 
 | |
| Removing SFP Modules | 
 | 
 | |
| 
 | Inserting and Removing the SFP Module Patch Cable | ||||||
| 
 | Removing the SFP Module Patch Cable | 
 | |||||
| 
 | Replacing the SD Flash Memory Card | 
 | |||||
| 
 | Connecting Devices to the Ethernet Ports | 
 | |||||
| 
 | Connecting to the 10/100 and 10/100/1000 Ports | ||||||
| 
 | Connecting to the 10/100 PoE Ports | 
 | |||||
| 
 | Where to Go Next  | 
 | 
 | 
 | 
 | 
 | 
 | 
| 
 | Power Supply Installation | 
 | 
 | 
 | 
 | 
 | 
 | 
| C H A P T E R 3 | 
 | 
 | 
 | 
 | 
 | ||
| 
 | Power Supply Modules  | 
 | 
 | 
 | 
 | 
 | |
| 
 | Power Supply Module Installation | 
 | 
 | 
 | |||
| 
 | Installation Guidelines | 
 | 
 | 
 | 
 | ||
| 
 | Installing a Power Supply Module | 
 | |||||
| 
 | Equipment That You Need | 
 | 
 | 
 | 
 | ||
| 
 | Grounding the Switch | 
 | 
 | 
 | 
 | 
 | |
| 
 | Installing the Power Supply Module in the Switch | ||||||
| 
 | Wiring the Power Source | 
 | 
 | 
 | 
 | ||
| 
 | Removing the Power Supply Module | 
 | 
 | ||||
Cisco CGS 2520 Hardware Installation Guide
| 
 | iv | 
 | |
| 
 | 
 | 
