Chapter 2 Switch Installation

Installing the Switch

Figure 2-14 Attaching 19-inch Rack Brackets for Wall Mounting

1

Phillips truss-head screws

Wall-Mounting (for IP-30 Compliance)

Follow these steps to mount the switch onto a wall and conform to IP-30 Compliance regulations.

Step 1 Insert the rubber plugs into the appropriate holes (see Figure 2-15). Follow the same procedure for the other side of the switch.

Step 2 Use a screwdriver or pen to completely push in the rubber plugs (see Figure 2-8).

Cisco CGS 2520 Hardware Installation Guide

 

78-19377-02

2-17

 

 

 

Page 39
Image 39
Cisco Systems CGS252016S8PC manual Wall-Mounting for IP-30 Compliance, Attaching 19-inch Rack Brackets for Wall Mounting