![](/images/new-backgrounds/1109054/109054275x1.webp)
Appendix B Installation In a Hazardous Environment
Connecting Destination Ports
Connecting to 100BASE-FX Ports
Follow these steps to connect a
Warning Class 1 laser product. Statement 1008
Caution Do not remove the rubber plugs from the SFF module port or the rubber caps from the
Before connecting to the SFF module, be sure that you understand the port and cabling stipulations in the “Preparing for Installation” section on page
Step 1 Remove the rubber plugs from the module port and
Figure B-37 Connecting to a Fiber-Optic SFP Module Port
1
202031
1
LC connector
Step 3 Insert the other cable end into a
Step 4 Observe the port status LED.
The LED turns green when the switch and the target device have an established link.
The LED turns amber while the STP discovers the network topology and searches for loops. This process takes about 30 seconds, and then the port LED turns green.
| Cisco IE 3000 Switch Hardware Installation Guide |
|