Step 1 Power down the WAVE appliance.

Chapter 4 Installing Hardware Options for the WAVE-594 and WAVE-694

Installing Memory

Step 1 Power down the WAVE appliance.

Step 2 Remove the WAVE appliance from the rack.

Step 3 Remove the primary access panel (See the “Removing the Cover” section on page 4-6).

Step 4 Open the DIMM slot latches for slots A1, A2, B1, and B2 and remove the existing memory modules.

Note All existing memory must be removed and replaced by the RDIMMS contained in the Cisco upgrade kit.

Step 5 Open the DIMM slot latches for slots A3 and B3.

Step 6 To upgrade from 8 GB to 12 GB on a WAVE-594, install a 2-GB RDIMM memory module into all six slots. (See Figure 4-6.)

To upgrade from 16 GB to 24 GB on a WAVE-694, install a 4-GB RDIMM memory module into all six slots. (See Figure 4-6.)

Figure 4-6 Installing an RDIMM

2

1

2

330140

Step 7 Check to make sure that the DIMM latches are fully engaged in the notches.

Step 8 Install the access panel.

a.Lower the access panel onto the WAVE appliance and then slide the access panel toward the back of the WAVE appliance.

b.Tighten the screw on the top that secures the access panel to the WAVE appliance.

Step 9 Install the WAVE appliance into the rack.

For complete rack installation and removal instructions, see Chapter 3, “Installing the WAVE-594 and WAVE-694.”

Caution Install the appliance only in a rack cabinet with perforated doors.