![](/images/new-backgrounds/1199808/19980837x1.webp)
Venting Installation
instructions
Continued
Vertical Termination Configurations for
Top Vent
Figures 30 and 33 show four different configura- tions for vertical termination.
VERTICAL VENT INSTALLATIONS USING MULTIPLE 90° ELBOWS (V)CD36T TOP VENT
Note: Install a
section prior to
attaching vent
termination cap.
90° Elbow
Venting with Three 90° Elbows
| Horizontal (H1) + |
Vertical (V) | Horizontal (H2) |
8' Min. | 5' Max |
10' Min. | 8' Max |
12' Min. | 11' Max |
14' Min. | 14' Max |
16' Min. | 17' Max |
18' Min. | 20' Max |
40' Min. | 20' Max |
Figure 30 - Vertical Venting
Configuration using Three 90° Elbows (Model (V)CD36T with Vertical Round High Wind Termination)
Venting with Two 90° Elbows
Vertical (V) | Horizontal (H) |
8' Min. | 6' Max |
9' Min. | 8' Max |
10' Min. | 10' Max |
12' Min. | 14' Max |
14' Min. | 18' Max |
40' Min. | 20' Max |
90° Elbow | Note: Install a |
| |
| restrictor ring |
| into inner pipe |
| section prior to |
| attaching vent |
| termination |
| cap. |
Figure 31 - Vertical Venting Configuration Using Two 90° Elbows (Model (V)CD36T with Vertical Round
High Wind Termination)
| Venting with Two 90° | |
| Elbows | |
| Vertical | Horizontal |
| (V1) | (H) |
| 8' Min. | 9' Max |
| 9' Min. | 11' Max |
| 10' Min. | 13' Max |
| 12' Min. | 17' Max |
| 14' Min. | 20' Max |
| Note: Install a | |
| ||
| restrictor ring | |
| into inner pipe | |
| section prior to | |
| attaching vent | |
90° Elbow | termination | |
cap. |
|
Note: Vertical (V1) + Vertical (V2) = 40' Max. Max. Horizontal Above 14' Vertical = 20'
Figure 32 - Vertical Venting
Configuration Using Two 90° Elbows (Model (V)CD36T with Vertical Round High Wind Termination)
www.desatech.com | 19 |