Instruction Manual
June 2007
NGA 2000 CLD
SECTION 2
INSTALLATION
WARNING
Before starting to install this equipment, read the "Essential instructions" on the inside cover and the Safety Summary beginning on page
Failure to follow the safety instructions could result in serious injury or death.
If the CLD Analyzer Module requires assembly with other components (e.g., the Platform and associated I/O Mod- ules), do so at this time.
To install the CLD Analyzer Module into a Platform:
1.Loosen the six fastening screws for the front panel of the Platform, hold the handles, and swing the front panel to the farest right.
If the Chemiluminescence (CLD) Analyzer Module is received as a separate unit, carefully examine the shipping carton and contents for signs of damage. Immediately notify the shipping carrier if the carton or contents is damaged. Retain the carton and packing material until all components associated with the CLD Analyzer Module are operational.
2.Following the guides on the bottom left and bot- tom center of the Platform, carefully slide the CLD Analyzer Module halfway into place
3.Lift the
If the module and Platform are difficult to assemble, remove the module, ensure the top cover of the module is firmly seated on the
4.Secure the module in position by releasing the pins, which seat in the available holes in the bottom of the case (see Figure
5.Connect network cable and power cable to the Analyzer Module (refer to Section
6.After startup and calibration have been performed, secure the front panel of the Platform with the six screws provided.
Pin Seats
Analyzer Module Guides
Figure
Emerson Process Management GmbH & Co.OHG | Installation 2 - 1 |