Instruction Manual
June 2007
NGA 2000 CLD
OPERATING AND MAINTAINING THIS APPARATUS
This instrument has left the factory in compliance with all applicable safety regulations.
To maintain this operating condition, the user must strictly follow the instructions and consider the warnings in this manual or provided on the instrument.
Before switching on the instrument, verify that the electrical supply voltage matches the instrument´s operating voltage as set in the factory.
Any interruption in the instrument´s ground line, whether inside or outside the instrument, or removal or interruption of its ground line connection, could result in hazardous operating conditions. Intentionally interrupting the instrument´s protective ground is strictly prohibited.
Opening cover panels could expose
Use only fuses of the correct type and current ratings as replacements. Using repaired fuses and short circuiting of fuse holders is prohibited.
Observe all applicable regulations when operating the instrument from an
Substances hazardous to health may emerge from the instrument‘s exhaust.
Please pay attention to the safety of your operation personnel. Protective measures must be taken, if re- quired.
NOTE
Software compatibility is necessary for all NGA 2000 components in your system to work together. The version of your Platform’s software must be equal to or greater than the version of any other module(s) for successful compatibility.
You can locate the version of each NGA 2000 component as follows:
Platform Controller Board
Turn power ON. The display should show „Control Module V3. ...“. This is the software version.
Analyzer Module
See note on the name plate label located on the right side of the Analyzer Module case.
Emerson Process Management GmbH & Co.OHG | Preface P - 3 |