NGA 2000 CLD
Instruction Manual
June 2007
Install the CLD Analyzer Module in a clean,
The analyzer should be installed within ±15° of horizon- tal.
NOTE
Unrestricted air flow to the rear of the Analyzer Module is critical to its performance and reliablilty.
a.Gas Conditioning (Sample Handling)
NOTE
All gases must be conditioned before supplying!
The gases must be
-dry
-free of dust (filtered for particulates down to two microns)
-free of aggressive components affecting gas paths materials (e.g. by corrosion)
-free of Ammonia etc. in order to prevent crystallin formation
Operating ambient temperature is 0 °C to 45 °C (32 °F to 113 °F). Temperature change should not exceed 10 °C (18 °F) per hour. The same temperature range restrictions apply to the location of the air and span gas cylin- ders.
before entering the Analyzer Module.
The gases should have a dew point 5 °C (13 °F) below coldest ambient temperature.
CAUTION
EXTERNALLY RESTRICT SAMPLE/CALIBRATION
GAS FLOW TO LESS THAN 2,200 cc/min.
Damage to internal components may occur if this flow level is exceeded.
No restrictor is provided in the sample inlet of this module. For those users who cannot externally limit sample flow, contact your local service or sales office.
MAXIMUM NOx | GAS SUPPLIED TO | SETTING ON OZONE | SETTING ON SAMPLE |
LEVEL IN PARTS | REAR PANEL AIR | PRESSURE GAUGE | PRESSURE GAUGE |
PER MILLION | INLET | (pressure values: gauge) | (pressure values: gauge) |
|
|
|
|
|
| 690 hPa (10 psig); provides flow | 344 hPa (5 psig); provides flow |
800 | Air | of approximately 500 cc/min. to | of approximately 200 cc/min. to |
|
| ozone generator | reaction chamber |
|
|
|
|
|
| 690 hPa (10 psig); provides flow | 344 hPa (5 psig); provides flow |
2,500 | Air | of approximately 1,000 cc/min. to | of approximately 70 cc/min. to |
|
| ozone generator. | reaction chamber. |
|
|
|
|
|
| 1035 hPa (15 psig); provides flow | 103 hPa (1.5 psig); procides |
10,000 | Oxygen | of approximately 1,000 cc/min to | flow of approximately 20 cc/min. |
|
| ozone generator. | to reaction chamber. |
|
|
|
|
Table
2 - 2 Installation | Emerson Process Management GmbH & Co.OHG |