
Model NGA2000 PMD
Instruction Manual
SECTION 2
INSTALLATION
If the Paramagnetic Analyzer Module is received as a separate unit, carefully examine the shipping carton and contents for signs of damage. Immediately notify the shipping carrier if the carton or contents is damaged. Retain the carton and packing material until all components associated with the Analyzer Module are operational.
If the Analyzer Module requires assembly with other components (e.g., the Platform and associated I/O Modules), do so at this time. Following the guides on the bottom left and bottom center of the Platform, carefully slide the Analyzer Module halfway into place.
WARNING
HAND INJURY HAZARD
Do not place hands or fingers in the Platform front handles when front panel is open. Dropping the front panel of the Platform while hand or fingers are inside either handle can cause serious injury.
Lift the
Install I/O Module(s) according to guidelines in the I/O manual. After startup and calibration have been performed, secure the front panel with the six screws provided.
ANALYZER MODULE GUIDES
PIN SEATS
DISENGAGED FRONT PANEL
Figure
Rosemount Analytical Inc. A Division of Emerson Process Management | Installation |