| Contents |
About This Guide |
|
Who Should Use This Guide | xiii |
How to Use This Guide | xiii |
Related Documents | xiii |
Document Conventions | xiv |
Commonly Used Acronyms | xiv |
Getting Help | xv |
Chapter 1: Introduction |
|
Overview | |
Features | |
PoE (Power over Ethernet) Support | |
Fan Management | |
Chapter 2: Installation |
|
Unpacking the | |
Shipped With the Switch | |
Required and Shipped Separately | |
Optional Enterasys Components | |
Order of Installation Steps | |
Mounting the Switch | |
Placing the Switch on a Flat Surface | |
Installing the Switch into a Rack | |
Installing and Removing a Power Supply | |
Power Supply Planning | |
Installing a Power Supply | |
Removing a Power Supply | |
Installing and Removing an IOM | |
Installing an Optional PoE Module on the | |
Installing an IOM | |
Removing an IOM | |
Connecting Power to the Switch | |
Connecting to the Console Port | |
Connecting to the RJ45 Console Port | |
Connecting to the USB Console Port | |
Connecting to the Network | |
Connecting UTP Cables to RJ45 Ports | |
Installing Optional SFP/XFP | |
Removing an XFP/SFP | |
Connecting | |
Completing the Installation | |
Installing an Optional PoE Module in the | |
Removing the Switch Cover | |
Installing the PoE Module | |
Chapter 3: Troubleshooting |
|
Checking the LEDs | |
SYSTEM LED | |
Power LEDs |
ix