XTP T UWP 202 Wallplate Transmitter • Installation and Operation 5
4. Route and connect cables to the rear and side panel connectors (see Rear and Side
Panel Connectors on page 7).
5. Mount the XTP T UWP 202 to the mud ring or metal junction box (see Mounting the
XTP T UPW 202 on page 9).
6. Connect inputs to the front panel connectors (see Front Panel Connections on
page 10).
7. Supply power to all connected devices.
Installing the Metal Junction Box or Mud Ring

Cutting an Opening in the Mounting Surface

1. Using an appropriate template or the mounting enclosure as a guide, mark the area
of the wall with a soft pencil that will be cut (for the provided mud ring, see Mounting
Template on page 40).
NOTE: Check with the manufacturer of the metal junction box for specific
installation requirements.
2. Use a jigsaw or small hand saw to carefully cut away the material within the guidelines
drawn in step 1.
NOTE: If using a template or the mud ring as a guide for cutting the hole in drywall,
cut inside the guidelines to maximize the contact the mud ring makes with the
drywall.
4. If using a mud ring in a wall with insulation inside, remove at least 6 inches of the
insulation in all directions around the cutout.
NOTE: If a wall stud interferes with removing 6 inches of insulation around the
cutout, remove the insulation between the cutout and wall stud.
5. Check the size of the opening by laying the mud ring or metal junction box against it.
The mounting device should fit snugly in the opening.
6. If needed, use a saw, file, or sandpaper to enlarge the hole.
CAUTION: Risk of personal injury. Smooth the edges of the opening to avoid
personal injury during installation.
ATTENTION: Smooth the edges of the opening to avoid damage to the mounting
device or the cables.