Friedrich 920-075-13 (1-11) operation manual Adjustment, Condensate Disposal System

Models: 920-075-13 (1-11)

1 64
Download 64 pages 18.04 Kb
Page 11
Image 11
Adjustment

FIGURE 10

ADJUST THE DIVIDER

Adjustment

LOOSEN THE TWO SCREWS LOCATED ON THE TOP SIDE OF THE DIVIDER. SLIDE THE TOP PART OF THE DIVIDER TOWARD THE OUTSIDE UNTIL THE SEALING STRIP MAKES CONTACT WITH THE OUTDOOR LOUVER. TIGHTEN THE DIVIDER SCREWS TO COMPLETE THE ADJUSTMENT.

NOTE: LET THE CAULK CURE COMPLETELY BEFORE INSTALLING THE CHASSIS. THIS COMPLETES THE PLENUM INSTALLATION.

Condensate Disposal Preparation for 9000 / 12000 / 18000 Models ONLY

IMPORTANT: THIS STEP MUST BE PERFORMED TO ENSURE THAT THE CHASSIS INSTALLS AND SEALS PROPERLY IN THE WALL PLENUM.

IF PROVISIONS FOR CONDENSATE DISPOSAL ARE MADE PRIOR TO CHASSIS INSTALLATION AND THE DRAIN IS TO BE LOCATED BENEATH THE PLATFORM FOR THE UNIT, USE THE ACCOMPANYING DRAWING AS A GUIDE FOR CUTOUT LOCATIONS. ONLY ONE DRAIN PER UNIT IS REQUIRED.

CONDENSATE DISPOSAL SYSTEM

THE CONDENSATE DISPOSAL SYSTEM INCREASES ENERGY EFFICIENCY UTILIZING A FACTORY INSTALLED FAN THAT SLING THE COLD CONDENSATE ONTO THE HOT OUTDOOR COIL.

WHEN HIGH OUTDOOR HUMIDITY PREVENTS THE SLINGER FROM DISPOSING OF ALL THE CONDENSATE, THE EXCESS CONDENSATE OVERFLOWS INTO THE CONDENSATE DRAIN PAN AND OUT OF THE ¾” INTERNAL DRAIN CONNECTIONS.

NOTE: IF THE CONDENSATE DISPOSAL SYSTEM FAILS TO REMOVE ALL OF THE CONDENSATE FROM THE UNIT, ANY EXCESS CONDENSATE WILL OVERFLOW FROM A SPILLWAY IN THE REAR OF THE UNIT DIRECTLY INTO THE WALL PLENUM, AND DRAIN OUTSIDE THE BUILDING. THIS IS YOUR INDICATION THAT THE CHASSIS OR DRAIN REQUIRES SERVICING.

9

Page 11
Image 11
Friedrich 920-075-13 (1-11) operation manual Adjustment, Condensate Disposal System