110 SPARC Enterprise T5120 and T5220 Servers Service Manual • July 2009
11. Connect the power supplies.
See “Connect Power Cords to the Server” on page 178
Note – As soon as the power cords are connected, standby power is applied.
Depending on how the firmware is configured,the system might boot at this time.
12. Power on the server.
See “Power On the Server Using the poweron Command” on page 179 or “Power
On the Server Using the Front Panel Power Button” on page180.
Related Information
“Remove a PCIe or XAUI Card” on page106
“Remove a PCIe/XAUI Riser” on page 102
“Install a PCIe/XAUI Riser” on page104
PCIe/XAUI Card Configuration Reference forSPARC Enterprise T5120 Servers
The following table shows the physical PCIe/XAUI slot locations on the SPARC
Enterprise T5120 server,as viewed from the rear of the system.
Use the following table to plan your PCIe/XAUI card configuration on SPARC
Enterprise T5120 server.
TABLE: FB-DIMMConfiguration Installation Map (SPARC Enterprise T5220 Servers)
PCIe 0/XAUI 0 PCIe 1/XAUI 1 PCIe 2
TABLE: PCIeand XAUI Support (SPARC Enterprise T5120 Servers)
Slot
PCIeController to
Whichthe Slot is
Connected Supported DeviceTypes FRUName
PCIe 0 or
XAUI 0*
1 x8 PCIe operating at x4
XAUI expansion card
/SYS/MB/RISER0/PCIE0
/SYS/MB/RISER0/XAUI0
PCIe 1 or
XAUI 1
1 x8 PCIe operating at x4
XAUI expansion card
/SYS/MB/RISER1/PCIE1
/SYS/MB/RISER1/XAUI1
PCIe 2 0 x16 PCIe operating at x8 /SYS/MB/RISER2/PCIE2