
66 SPARC Enterprise T5120 and T5220 Servers Service Manual • July 2009
4. From the front of the server, pull the release tabs forward and pull the server
forward until it is free of the rack rails as shown in the following figure.
A release tab is located on each rail.
FIGURE: Release Tabsand Slide Assembly
5. Set the server on a sturdy work surface.
Accessing Internal ComponentsThese topics explain how to access components contained within the chassis and the
steps needed to protect against damage or injury from electrostaticdischarge.
■“Perform Electrostatic Discharge Prevention Measures” on page 67
■“Remove the TopCover” on page 67