Returning the Server to Operation 179
Note – As soon as the power cords are connected, standby power is applied.
Depending on how the firmware is configured,the system might boot at this time.
Related Information
“Power On the Server Using the poweron Command” on page 179
“Power On the Server Using the Front Panel Power Button” on page180
Power On the Server Using thepoweron Command
Note – If you are powering on the server following an emergency shutdown that
was triggered by the top cover interlock switch, you must use the poweron
command.
Typepoweron at the service processor prompt.
Youwill see an -> Alert message on the system console. This message indicates
thatthe system isreset. You will also see a message indicating that the VCORE has
been margined up to the value specified in the default .scr file that was
previously configured. For example:
Related Information
“Power On the Server Using the Front Panel Power Button” on page180
-> poweron
-> start /SYS