Manuals
/
GE
/
Household Appliance
/
Water System
GE
E4H-CE Series, E8-CE Series, 000 gpd to 288 manual
Models:
000 gpd to 288
E4H-CE Series, E8-CE Series
000 gpd
1
44
45
45
Download
45 pages
17.31 Kb
38
39
40
41
42
43
44
45
<
>
Troubleshooting
Specifications
Install
Membrane Element Replacement
Warranty
Maintenance
Warning Always Turn Power Off To Change Any Wiring
Symptom
Switch Setting
Clean the machine with approved Osmonics cleaners
Page 44
Image 44
Page 43
Page 45
Page 44
Image 44
Page 43
Page 45
Contents
3 m3/hr to 45 m3/hr 18,000 gpd to 288,000 gpd
Operation and Maintenance Manual
E4H-CE AND E8-CE SERIES WATER PURIFICATION MACHINES
Page
INSTRUCTIONS FOR E4H-CE AND E8-CE WATER PURIFICATION
OPERATION AND MAINTENANCE MANUAL
TABLE OF CONTENTS
MACHINE OPERATION AND MAINTENANCE
Cleaning
Membrane Element Replacement
FIELD INSTALLED ACCESSORIES
LIST OF FIGURES
LIST OF TABLES
Normal Versus Cross Flow Filtration
Membrane Element with Interconnectors
Principles of Operation
Cavg
Recovery
Rejection
Cavg - CP x
Cavg
400 5 66
· · · · · · · · · · · · ·
2000 ppm NaCl
1.4 Specifications for E-CE Series Machines
Flow Specifications for Reverse Osmosis E-CE Machines
Minimum/Maximum Min/Max Boost Pressure
Membrane Element Specifications
Feed Water Requirements
Connections
MACHINE
E4H-CE
E8-CE
3.0 PREPARATION AND START-UP 3.1 Pretreatment for Water Purification
Free chlorine
Iodine compounds Quaternary germicides Cationic surfactants
3.2 Initial Start-Up
STEPS
3. Check for leaks at all connection points
WARNING ALWAYS TURN POWER OFF TO CHANGE ANY WIRING
The system is now operational
3.3 Daily Start-Up
4.0 MACHINE OPERATION AND MAINTENANCE
3. Clean the machine with approved Osmonics cleaners
4.3 Cleaning
1. Change the pre-filter cartridges 2. Flush the machine
To clean membrane elements STEPS
2. Drain all water from the pre-filter cartridge housing
4.5 Membrane Element Replacement
4.4 Draining Machine for Shipment
STEPS 1. Disconnect the inlet, concentrate, and permeate outlets
14. Return to Initial Start-Up Section
STEPS
NOTE Follow Membrane Element Specifications Table
4.6 Membrane Element Removal
Page
STEPS
5.4 Clean-In-Place Installation
5.3 Chemical Pump
TROUBLESHOOTING
SYMPTOM
POSSIBLE CAUSES
REMEDIES
TROUBLESHOOTING
SYMPTOM
POSSIBLE CAUSES
REMEDIES
TROUBLESHOOTING
SYMPTOM
plumbing to the valve
POSSIBLE CAUSES
POSSIBLE CAUSES
REMEDIES
High operating pressure
Water flowing when
SYMPTOM
continued
Machine not operating
POSSIBLE CAUSES
Electrical machine shut
down
SYMPTOM
POSSIBLE CAUSES
Conductivity drifts or
changes after calibration
Display is blank
pH reading is off by more
Chemical pump will not
feed chemical
Chemical pump feed
reverse of what you expect
7.0 FORMS 7.1 RETURN GOODS AUTHORIZATION RGA
Switch Setting
E - S E R I E S S T A R T - U P D A T A S H E E T
Customer
Date
E-SERIES DAILY LOG SHEET
8.0 WARRANTY 8.1 Warranty Terms
8.4 Voidability of Warranty
5951 Clearwater Drive Minnetonka, MN 55343 USA
Minnetonka Operations Attn Customer Service Center
GE OSMONICS, INC
Page
Manufactured in the USA