Installation Information
For operation above 3,000 feet, order WB28K10553 Conversion Kit. This kit includes orifices for both LP and Natural gas operation.
WB28K10554to 40,800 BTU’s.
MATERIALS PROVIDED
| 1/2" Pipe | Oven Rack |
|
| Elbow |
| |
Lubricant | Runners | ||
Bracket, Brace |
|
| (to protect |
and Screws |
|
| flooring) |
| Drill and |
Saber Saw | Appropriate Bits |
| |
Measuring Tape | Adjustable Wrench |
| |
| 1/4" Driver or Wrench |
Carpenter’s Square |
|
Safety Glasses
Phillips #2 Screwdriver
Level | Hand Truck |
Joint | Pipe Fittings | |
Sealant |
|
|
metal gas supply
8