GTO SL-1000B Preparing The Gates, First Gate Operator, Control Unit, Second Gate Operator

Models: SL-1000B SL-2000B

1 43
Download 43 pages 59.51 Kb
Page 36
Image 36
PREPARING THE GATES

PREPARING THE GATES

Install PVC conduit (not included) needed for power cables and low voltage wiring – see illustration below. The PRO SL-1200 and SL-2200 power cable and safety edge (required) wiring should be run through PVC conduit underneath the driveway. If you cut the driveway be sure to reseal it after all wiring is installed.

 

 

 

Contact Sensor

 

 

Roller Guard

(REQUIRED)

Contact Sensor

Contact Sensor

(REQUIRED)

Receiver

 

(REQUIRED)

(REQUIRED)

 

(cable in separate

 

 

 

conduit)

!WARNING

 

Injury Or Death

 

120 Volt Indoor

 

Moving Gate Can Cause

 

 

 

 

Chain Bracket

Transformer

 

Chain Bracket

 

 

STAND CLEAR

(Surge Protector

 

 

 

 

 

CAUTION

not supplied)

 

 

SL-1000

 

 

 

or SL-2000

 

 

 

First Operator

 

 

Chain

 

Roller Guard

 

 

 

(REQUIRED)

 

Roller Guard

 

 

PVC Conduit for

(REQUIRED)

 

 

First Gate Operator

 

Run up to 1000' of low

power cable.

PVC Conduit for

voltage wire to control

second operator

 

 

 

 

(Control Unit)

power cable.

box from transformer

 

 

(wire not included).

Contact Sensor

Roller Guard

 

Contact Sensor

(REQUIRED)

 

(REQUIRED)

 

Contact Sensor

(REQUIRED)

 

 

 

 

 

(REQUIRED)

 

 

 

! WARNING

 

 

 

Moving Gate Can Cause

 

 

 

Injury Or Death

 

 

Chain Bracket

 

 

 

CAUTION

 

Chain Bracket

 

STAND CLEAR

 

 

 

SL-1200

 

 

 

or SL-2200

 

 

 

Second Operator

 

 

 

 

 

Chain

Roller Guard

 

Roller Guard

PVC Conduit for

(REQUIRED)

 

(REQUIRED)

 

 

 

second operator

Second Gate Operator

power cable.

 

(Auxiliary Unit)

 

34

Page 36
Image 36
GTO SL-1000B, SL-2000B Preparing The Gates, First Gate Operator, Control Unit, Second Gate Operator, Auxiliary Unit