DUAL GATE SYSTEM INSTALLATION
Install the second gate operator in the same manner as the Single gate operator starting on page 14 of this manual. The second gate preparation and wiring of the second (auxiliary) operator follow on the next two pages. Once the second gate operator is installed, Set the DIP switches for DUAL gates and the order in which the gates open (“sequencing”). Setting the Control Board for Dual Gate Installations begins on page 37.
SECOND GATE (AUXILIARY) OPERATOR PARTS & HARDWARE
Second Gate Operator
(2)2”squarex48”longlegs
The
Battery
Operator Housing
32’ Drive Chain
|
| 60’ Power Cable |
(2) Chain Brackets | Battery Cable | w/ Strain Relief |
|
|
(4)
(4) 3/8” Lock Washers
(RB641)
(4) |
| ||
(8) | 3/8” Serrated Nuts (RB210) | (2) Chain Master Links | |
|
|
| (RB208) |
(4) 3/8” Nuts |
|
|
|
(RB668) |
|
|
|
(4) 3/8” | (2) Quick Release Pins (211IH) |