DUAL GATE SYSTEM INSTALLATION

Install the second gate operator in the same manner as the Single gate operator starting on page 14 of this manual. The second gate preparation and wiring of the second (auxiliary) operator follow on the next two pages. Once the second gate operator is installed, Set the DIP switches for DUAL gates and the order in which the gates open (“sequencing”). Setting the Control Board for Dual Gate Installations begins on page 37.

SECOND GATE (AUXILIARY) OPERATOR PARTS & HARDWARE

Second Gate Operator

(2)2”squarex48”longlegs

The SL-2200 comes with a battery and control box the SL-1200 does not.

Battery

Operator Housing

32’ Drive Chain

 

 

60’ Power Cable

(2) Chain Brackets

Battery Cable

w/ Strain Relief

 

 

(4) 1/4-20 x 1/2Screws (RB226)

(4) 3/8Lock Washers

(RB641)

(4)

3/8”-16 x 2” diameter U-Bolts and

 

(8)

3/8Serrated Nuts (RB210)

(2) Chain Master Links

 

 

 

(RB208)

(4) 3/8Nuts

 

 

 

(RB668)

 

 

 

(4) 3/8-16 x 3Carriage Bolts (RB659)

(2) Quick Release Pins (211IH)

33

Page 35
Image 35
GTO SL-2000B, SL-1000B installation manual Dual Gate System Installation, Second Gate Auxiliary Operator Parts & Hardware