DETERMINING THE MOUNTING POSITION AND MOUNTING THE OPERATOR

STEP 2

 

Illustration B

Install chain brackets at each end of the gate on the inside

 

(operator side) of the gate (see Overview Illustration, page. 12).

 

Position the tops of chain brackets no more than 6” above the

String

bottom corners of the gate frame and secure with U-bolts (see

 

Illustration B). The chain brackets will work on gate frames

Quick Release Pin

 

13/4” to 21/2” in diameter or square tube gates. The U-bolts

Chain Bracket

 

provided will work on 2” diameter pipe gate frames.

 

Illustration C

 

 

Chain Bracket

 

position bracket so that string

 

 

 

 

will be approximately 7" to 10"

 

 

from ground level at the point where

 

 

the operator will be mounted

 

 

STEP 3

 

 

Insert a quick release pin into the center slot in each of the chain brackets

Quick Release Pin

String

(see Illustration C). Tie a string to the end of each quick release pin so

that the string is tight between the two chain brackets (the string will

 

 

be used to align the operator). The string should be 7”-10” from the

 

 

ground (see Illustration B). The chain brackets can be adjusted up or

 

 

down on the gate to achieve the proper height. The goal here is to set

 

 

the height of the operator so that when the housing is in place it will

 

 

clear the ground by 1” to 4” (see Illustration E).

Illustration D

 

 

 

 

 

 

Center pointCbetween posts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fence Post

Chain Sprockets

L

Fence Post

 

Gate

 

 

 

 

 

 

 

 

 

 

 

 

 

Roller

 

 

 

 

 

 

 

 

 

Roller

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

String

Operator

(centered between post)

STEP 4

 

Find the center point between the two roller/fence posts (see

 

Illustration D). This should coincide with the position of the

Illustration E

center point of the operator. Dig a hole approximately 12” x 28”

Level

wide x 28” deep. Place the operator in the hole on its legs and

 

position the bottom idler sprockets on the top of the string and

!

level the unit (see Illustration E). Make sure operator is level

!

and plumb. With the unit level and in place, pour the concrete

Sprockets

and let set for 24 hours (checking the level periodically) before

String 7" to 10"

proceeding to the next step.

above ground

 

BEFORE POURING CONCRETE: 1] Make sure operator is

Housing

 

centered between roller posts and aligned with string; and,

1" to 4" clearance

2] Determine method of installing conduit for wiring (see page

Ground Level

13)!

 

14

Page 16
Image 16
GTO SL-1000B, SL-2000B Determining the Mounting Position and Mounting the Operator, Proceeding to the next step