Haier 3150 SA Preventive Maintenance Schedule, Operator, Maintenance Person, Task, Monthly

Models: 1590 SB 3150 SA 3150 SF 1590 SA 3150 SB

1 40
Download 40 pages 55.19 Kb
Page 12
Image 12

Maintenance

Preventive Maintenance Schedule

Establish a preventive maintenance schedule based on the pump’s service history. This is especially important for prevention of spills or leakage due to diaphragm failure.

The following is a list of recommended maintenance procedures and frequencies to operate your equipment safely. Maintenance must be performed by trained per- sonnel per this schedule to assure safety and reliability of the equipment.

 

Operator

Maintenance Person

 

 

 

 

Task

Daily

Weekly

Monthly

 

 

 

 

Inspect system for leaks

 

 

 

 

 

 

Depressurize fluid, after

 

 

operation

 

 

 

 

 

 

 

 

 

Remove heat from system,

 

 

after operation

 

 

 

 

 

 

 

 

 

Inspect diaphragm for wear

 

 

 

 

 

 

Inspect check valve compo-

 

 

nents for wear

 

 

 

 

 

 

 

Check hoses for wear

 

 

 

 

 

 

Check/tighten fluid connec-

 

 

tions

 

 

 

 

 

 

 

Check/tighten air connec-

 

 

tions

 

 

 

 

 

 

 

Lubricate air valves

 

 

 

 

 

 

12

310622L

Page 12
Image 12
Haier 3150 SA, 3150 SB, 3150 SF Preventive Maintenance Schedule, Operator, Maintenance Person, Task, Monthly, 310622L