Haier air conditioner | Edition: 20070116 |
Outdoor unit
5.Purging Method:To use vacuum pump
Detach the service port's cap of
Gaugemanifold(for R410A)
Anti countercurrent joint
Tube(for R410A) | Vacuum pump(for R410A) |
Open the handle at Iow in gaugemanifold, operate vacuum pump. If the
reach vacuum condition in a moment, check again.
Vacuumize for over 15min. And check the level gauge which should read
Check the condition of the scale and hold it for
Open the valve rod for the
After 6 seconds, close the
In case of gas leakage, tighten
No gas leakage? parts of pipe connection. If leakage stops, then proceed steps.
Detach the charge hose from the service port, open
Open
Close
Open
90O
If it does not stop gas leakage, discharge whole refrigerants from the service port. After flaring work again and vacuumize, fill up prescribed refrigerant from the gas cylinder
6.35mm(1/4") | 9.52mm(3/8") |
| 12.7mm(1/2") |
To prevent the gas leakage, turn the service port's cap, the valve rod's cap for
After attaching the each caps, check the gas leakage around the caps.
CAUTION:
1.If the refrigerant of the air conditioner leaks, it is necessary to discharge all the refrigerant. Vacuumize first, then charge the liquid refrigerant into air conditioner according to the amount marked on the name plate.
Valve rod cap
Valve rod cap
Service port cap
2.Please do not let other cooling medium, except specified one (R410A),
or air enter into the cooling circulation system. Otherwise, there will be
abnormal high pressure in the system to make it crack and lead to
personal injuries.
- 88 -