(3-way) Valve

(2) Evacuation

(All amount of refrigerant leaked)

Indoor unit

Liquid side

 

 

 

 

 

Outdoor unit

 

2-Way

 

 

valve

Open

 

Gas side

 

 

3-Way

 

 

valve

Open

Vacuum pump

 

 

 

Lo

 

OPEN

CLOSE

 

Procedure

1.Confirm that both the liguid side valve and gas side valve are set to the opened position.

2.Connect the vaccum pump to the center hose of the manifold gauge.

3.Connect the service port of the gas side valve to the low side of the gauge.

4.Evacuation for approximately one hour.

-Confirm that the gauge needle has moved toward-76 cmHg (vacuum of 4 mmHg or less).

5.Close the Low handle of the gauge turn off the vacuum pump, and confirm that the gauge nee- dle does not move(approximately 5 minutes after turning off the vacuum pump).

6.Disconnect the charge hose from the vacuum pump.

-Vacuum pump oil.

If the vacuum pump oil becomes dirty or deplet- ed,replenish as needed.

7.Mount the valve caps and the service port caps.

Service Manual 49

Page 49
Image 49
Heat Controller DMC36CA-1 Evacuation, All amount of refrigerant leaked, Mount the valve caps and the service port caps