Channel Bracket Installation (Pre-existing Hardware Installations)

When choosing a location and installing the optional channel bracket:

Do not exceed 150 lbs. maximum load on the channel bracket.

Leave a minimum of 16 in. (40.64 cm) of horizontal space between the hardware used to attach the channel bracket to the wall.

An electrical outlet must be easily accessible.

The mounting location should be dry, stable, easily accessible, and well lighted.

Tools Required

Drill

7/8 in. Drill Bit (for hollow wall installations) or 1/4 in. Drill Bit (for wood stud installations)

#2 Phillips Screw Driver

Medium Flat Head Screw Driver

9/16 in.Socket Wrench

Hardware Required

3/8 in.-16 spring nut, for 13/16 in. deep strut, Qty. 4 per wall bracket

3/8 in. flat washer, Qty. 4 per wall braket

3/8 in.-16 x 1.00 in., cap screw, grade 5, Qty. 4 per wall bracket

Hollow Wall Installations:

3/8 in. x 4 in. round head toggle bolt, 2-5/8 in. usable length, Qty. 4 3/8 in. flat washer, Qty. 4

Wood Stud Installations:

3/8 in. x 2 1/2 in. length hex head lag screw, Qty. 4 3/8 in. fat washer, Qty. 4

Installation

1.Slide the spring nuts into the channel of the bracket and position them to line up with the mounting holes on the wall bracket.

Spring Nut

 

 

 

13.78 in.

 

 

 

Wall Bracket

 

 

 

[ 35 cm ]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6.5 in.

Wall Mount Holes

[16.5 cm]

 

Channel Bracket

15 - 9