W A R N I N G

E q u i p m e n t C a b i n e t

N o t e

Installing the Switch

Installation Procedures

3. Mount the Switch

After the switch passes self test, it is ready to be mounted in a stable location. The 2610 Switches can be mounted in these ways:

Mounting Location

Non-PWR Switches

PWR Switches

 

 

 

In a rack or cabinet

Yes

Yes

On a horizontal surface

Yes

Yes

On a wall

Yes

No

 

 

 

Rack or Cabinet Mounting

The 2610 Switches are designed to be mounted in any EIA-standard 19-inch telco rack or communication equipment cabinet. Note that the mounting brackets have multiple mounting holes and can be rotated allowing for a wide variety of mounting options. Secure the rack in accordance with the manufacture’s safety guidelines.

For safe operation, please read the mounting precautions on page 2-3, before mounting a switch.

The 12-24 screws supplied with the switch are the correct threading for standard EIA/TIA open 19-inch racks. If installing the switch in an equipment cabinet such as a server cabinet, use the clips and screws that came with the cabinet in place of the 12-24 screws that are supplied with the switch.

Switch the Installing

2-9