Chapter 4 • Working with Quality Center Synchronizer
Enabling and Disabling Synchronization LinksEach synchronization link can be in one of the following states: Unvalidated, Disabled, and Enabled. The following table lists these states and their descriptions. It also lists under what circumstances the link moves between states.
State | Description | When State Entered | When State Left |
|
|
|
|
Unvalidated | The link’s | Upon creation of a | Upon execution of an |
| configuration | new link or | integrity check. For |
| has not been | modification of the | more information on |
| verified. You | configuration of an | running integrity |
| cannot run tasks | existing link. | checks, see “Running |
| for the link. |
| |
|
|
| |
|
|
|
|
Disabled | The link’s | Upon successful | Manually to status |
| configuration | completion of an | Enabled, or after |
| has been | integrity check, or | modification of link |
| verified, but you | manually from | configuration to status |
| cannot run tasks | status Enabled. | Unvalidated. |
| on the link. |
|
|
|
|
|
|
Enabled | The link’s | Manually from | Manually to status |
| configuration | status Disabled. | Disabled, or after |
| has been |
| modification of link |
| validated, and |
| configuration to status |
| you can run |
| Unvalidated. |
| tasks on the |
|
|
| link. |
|
|
|
|
|
|
1In the Links list or Links Grid, select the link you want to enable.
2Make sure that the link is in the state Disabled. If the link is in the state Unvalidated, you must run an integrity check to change its state to Disabled. For more information on running integrity checks, see “Running Link Tasks Manually” on page 91.
3 Click the Enable Link button or choose Link > Enable.
102