Installing the Device

2

 

This chapter describes how to install a NetScreen-5000 Series in an equipment rack or on a desktop and how to configure the device on a network. Topics in this chapter include:

•“General Installation Guidelines” on page 14

•“Equipment Rack Installation Guidelines” on page 14

•“Mounting the NetScreen-5000 Series” on page 15

–“NetScreen-5200 Front and Rear Mount” on page 15

–“NetScreen-5200Mid-Mount” on page 16

–“NetScreen-5400 Front Mount” on page 16

•“Installing and Connecting the AC Power Supply” on page 17

•“Installing and Wiring a DC Power Supply” on page 17

•“Establishing an HA Connection” on page 19

•“Connecting the NetScreen-5000 Series to a Router or Switch” on page 19

NetScreen-5000 Series

13

Page 21
Image 21
Juniper Networks 5000 manual Installing the Device