Operation
3.2.12Meter Calibration Screen
Go to the Master Menu and move the highlighted cursor to METER CALIBRATION. Press the Select pad and the Meter Calibration screen is displayed.
The Meter Calibration screen enables a Liebert
NOTE
Bypass volts are calibrated only at the System Control Cabinet (SCC). Input amps, DC volts, DC amps and temperature are calibrated only at the UPS modules.
! CAUTION
Meter calibrations are
! WARNING
Do not attempt to calibrate meters without adequate training. Meter calibration requires special test equipment, access to test points in sensitive circuitry and exposure to hazardous voltage.
Figure 49 Meter calibration screen
SECURITY ACCESS
METER CALIBRATION
UP: CURSOR UP
DOWN: CURSOR DOWN
SELECT: CHOOSE
|
| D.C. VOLTS |
|
|
| D.C. AMPS | PHASE |
INPUT VOLTS | PHASE | OUTPUT VOLTS | |
INPUT VOLTS | PHASE | OUTPUT VOLTS | PHASE |
INPUT VOLTS | PHASE | OUTPUT VOLTS | PHASE |
INPUT AMPS | PHASE A | OUTPUT AMPS | PHASE A |
INPUT AMPS | PHASE B | OUTPUT AMPS | PHASE B |
INPUT AMPS | PHASE C | OUTPUT AMPS | PHASE C |
|
| TEMPERATURE |
|
61