Operation

Table 9

Alarm messages - meaning and corrective action (continued)

Alarm

 

 

Cabinet

Special

 

Message

 

Location

Functions

Meaning and Corrective Action

BYPASS (Cont’d.)

 

 

 

Auto Transfer to

 

 

 

The critical load has been automatically transferred to the bypass line.

 

SCC

D, E, F

Use the History Status screen to determine the cause for the transfer.

Bypass

 

 

Clear all of the alarms before attempting to retransfer the load from

 

 

 

 

 

 

 

 

 

bypass to UPS.

Auto Retransfer

 

 

 

An automatic retransfer will be initiated when the OK to Transfer condition

 

SCC

has been present for 10 seconds, if the overload has dropped below

Primed

 

 

 

 

 

 

100% of the rated SCC current and if enough UPS modules are on-line.

 

 

 

 

 

 

 

 

 

 

A manual retransfer is required. Either a system overload condition has

Manual Reset/

 

 

 

lasted more than 5 minutes or no more auto-retransfer attempts are

 

SCC

available. Note that this alarm is only used if auto-retransfer attempts are

Retransfer

 

 

 

 

 

 

enabled.

 

 

 

 

 

 

 

 

 

 

Perform a manual retransfer if all necessary conditions are present.

 

 

 

 

 

The UPS output is not synchronized to the bypass power source. The

 

 

 

 

 

static bypass switch is disconnected or it has failed internally.

Static Switch

 

SCC

D, S

Emergency and overload transfer to the bypass source is not available.

 

Manually set the Static Switch Disconnects to ON (closed) if the static

Unable

 

 

 

 

 

 

switch is disconnected. If the alarm conditions are automatically

 

 

 

 

 

 

 

 

 

 

corrected, reset the alarm to clear it. Contact Liebert Global Services if the

 

 

 

 

 

alarm stays on.

Bypass Not

 

 

SCC

The bypass power source voltage is not within specifications.

Available

 

 

Correct the bypass AC power source.

 

 

 

 

 

 

 

 

 

The power conductors on the bypass line are not wired to the UPS in the

 

 

 

 

 

required sequence. This alarm should appear only during initial start-up or

Bypass Phase

 

SCC

D, L, S

after a repair to the source power system.

Sequence Wrong

Disconnect power from the bypass line and correct the wiring. A Liebert

 

 

 

 

 

 

 

Global Services representative must be present during initial start-up of

 

 

 

 

 

your UPS System.]

UPS SYSTEM

 

 

 

 

Input Current

 

 

 

At least one input phase differs from the average current by 10% or more

 

MMU

D, E

for four (4) hours. Contact Liebert Global Services. If the condition

Unbalance

 

 

 

 

 

 

persists, transfer the load to the bypass line.

 

 

 

 

 

 

 

 

SCC

D, L, S

The logic control power supply from the UPS output is not operating

Control Power

 

 

 

properly. The UPS module continues operating but will shut down if the

 

 

 

Fail

 

 

MMU

D, L, S

input power fails. The SCC continues operating but will shut down if the

 

 

 

 

 

bypass power fails. Contact Liebert Global Services immediately.

Output Over/

 

 

 

Output frequency differs from the nominal (60 Hz) by more than 0.5 Hz.

 

SCC

D, L, S

No transfer or shutdown occurs.

Under Frequency

 

 

Contact Liebert Global Services at once.

 

 

 

 

 

 

 

 

 

 

The UPS system output voltage is under the minimum (-12%) deviation

Output

 

 

SCC

D, F, L, S

from nominal. The load automatically transfers to the bypass line.

 

 

If the alarm condition is no longer present, reset the alarm and retransfer

Undervoltage

 

 

 

 

the load from bypass to UPS. Contact Liebert Global Services if alarm

 

 

 

 

 

 

 

 

 

 

persists.

 

 

 

 

 

The UPS system output voltage is above the maximum (+10%) deviation

Output

 

 

 

 

from nominal. The load automatically transfers to the bypass line. All UPS

 

 

SCC

D, F, L, S

modules are taken off-line and are shut down.

Overvoltage

 

 

 

 

 

 

Contact Liebert Global Services at once. Do not attempt to reset circuit

 

 

 

 

 

 

 

 

 

 

breakers.

 

 

 

SCC

D, R, S

The UPS output current exceeds the rated system load current. This

Overload

 

 

 

 

condition causes an alarm only, the UPS does not shut down.

 

 

 

 

 

 

MMU

D, S

Determine cause of the overload. Reduce the load until the overload

 

 

 

 

 

 

 

 

condition is corrected. Reset the UPS alarm.

Table 9 Abbreviations

 

 

 

D = auto-dial;

 

L = latches

 

 

E = logs only;

 

R = remote

 

 

F = freezes;

 

S = summary

 

 

D* = auto-dial initiated by Auto Transfer to Bypass if load is on UPS when alarm occurs

D# = auto-dial initiated through Module N (1-6) off-line

66

Page 72
Image 72
Liebert 1000kVA Auto Retransfer, Primed, Manual Reset, Static Switch, Unable, Bypass Not, Available, Bypass Phase