This section includes instructions on how to install, configure and perform initial electrical checks of your UPS installation.

DO NOT attempt to start the UPS, turn on any circuit breaker or energize the input power until instructed to do so in 7.0 - Initial Startup and Electrical Checks.

Visually inspect the UPS for freight damage. Report damage to the carrier and your local dealer or Liebert representative.

! CAUTION

The UPS is heavy (see 14.0 - Specifications). Take proper precautions when lifting or moving it.

Install the UPS indoors in a controlled environment, where it cannot be accidentally turned off. Place it in an area of unrestricted airflow around the unit, away from water, flammable liquids, gases, cor- rosives and other conductive contaminants. Maintain a minimum clearance of 4" (100mm) in the front and rear of the UPS. Maintain an ambient temperature range of 32°F to 104°F (0°C to 40°C).

NOTE

UPS operation in sustained temperatures above 77°F (25°C) reduces battery life.

6.1Install the Main Cabinet

The GXT2-6000RT208 may be installed either as a tower unit or in a rack, depending on available space and use considerations. Determine the type of installation and follow the appropriate instruc- tions in either 6.1.1 - Tower UPS Installation or 6.1.2 - Installing the Adjustable Rack-MountKit—Sold Separately.

6.1.1Tower UPS Installation

When using the GXT2-6000RT208 in a tower configuration, use the included support base (shown below, left) to stabilize the UPS.

If any external battery cabinets are added, they will include spacers to accommodate the additional cabinets (shown below, right).

Figure 2 Support base and spacers

End Bases

2U Spacer

Spacers added to support

4U Support Basebase to accommodate additional battery cabinets

Attach Bezels to Top

When used as a tower, the GXT2-6000RT208 requires bezels attached to the top. To connect the bezels:

1.Position the UPS so that the battery compartment is on the bottom.

2.Attach the top bezels by placing them on the mounting holes and sliding them toward the rear of the UPS.