Lincoln Electric R3R-300, R3R-500 service manual Main Transformer T1 Voltage Test, Test Procedure

Models: R3R-500 R3R-300

1 108
Download 108 pages 14.61 Kb
Page 54
Image 54

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

F-20

F-20

TROUBLESHOOTING & REPAIR

MAIN TRANSFORMER (T1) VOLTAGE TEST (continued)

FIGURE F.7 – INPUT CONTACTOR, RECONNECT PANEL, AND PRIMARY LEADS

TO MAIN TRANSFORMER LOCATIONS

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

TEST PROCEDURE

1.Set the ON/OFF power switch to OFF.

2.Disconnect main input supply power from the machine.

3.With the 5/16” nut driver, remote the case top and sides and the reconnect panel cover.

4.Inspect the input contactor, reconnect panel, and primary leads to the main trans- former for loose or faulty connections. See Figure F.7.

a.Confirm that the reconnect panel is connected properly for the three-phase main input supply power supplied to the machine. See the reconnect panel connection diagram located on the inside of the input box assembly access door.

5.Connect main input supply power to the machine.

6.Set the ON/OFF power switch to ON.

a.Make sure the input contactor (CR1) energizes and the fan runs.

7.Test with an AC voltmeter for proper main input supply voltage to the line side of the input contactor (CR1). See the Wiring Diagram.

a.L1 to L2.

b.L2 to L3.

c.L1 to L3.

IDEALARC R3R

Page 54
Image 54
Lincoln Electric R3R-300, R3R-500 service manual Main Transformer T1 Voltage Test, Test Procedure