INSTALLATION |
Return to Section TOC
SELECT SUITABLE LOCATION
Locate the welder in a dry location where there is free circulation of clean air into the louvers in the back and out the front of the unit. A location that minimizes the amount of smoke and dirt drawn into the rear louvers reduces the chance of dirt accumulation that can block air passages and cause overheating.
WORK CLAMP INSTALLATION
Attach the work clamp per the following:
1.Unplug the machine or turn the power switch to the “OFF” position.
2.Insert the work cable terminal lug with the larger hole through the strain relief hole in the work clamp as shown in Figure
STACKING
3. Fasten securely with the bolt and nut provided.
FIGURE A.3
Return to Section TOC
Section TOC
Return to Master TOC
Return to Master TOC
Master TOC
TILTING
Each machine must be placed on a secure, level sur- face, either directly or on a recommended undercar- riage. The machine may topple over if this procedure is not followed.
OUTPUT CONNECTIONS
Refer to Figure A.2.
1.Work Cable Access Hole.
2.Gun Cable and Control Lead Access Hole.
3.Connector Block.
4.Gun Trigger Lead Connectors.
5.Positive (+) and negative
Strain Relief Hole
Work Cable
Nut & Bolt
Work Clamp
WORK CABLE INSTALLATION
Refer to Figure A.2.
1.Open the wire feed section door on the right side of the
2.Pass the end of the work cable that has the termi- nal lug with the smaller hole through the Work Cable Access Hole (1) in the case front.
Return to
Return to Section TOC
Return to
Return to Master TOC
FIGURE A.2
4
5
8
2
1
3 | 7 |
| 6 |