Miller Electric A.B.B. Robot Interface Gas Control Hub And Spindle Operation, Safety Equipment

Models: A.B.B. Robot Interface Gas Control Hub And Spindle

1 40
Download 40 pages 34.02 Kb
Page 21
Image 21

2-14. Installing Optional Reel-Type Wire

 

 

 

 

 

 

1

Retaining Ring

 

 

 

 

 

 

2

Lock

 

 

 

 

 

 

3

Spanner Nut

1

2

3

4

 

 

4

Wire Retainer

 

 

 

 

 

 

5

Welding Wire

 

 

 

 

 

 

6

Wire Reel

 

 

 

5

 

 

7

Hub

 

 

 

 

 

 

Remove retaining ring. Pull lock

 

 

 

 

 

 

and turn. Remove spanner nut, wire

 

 

 

 

6

 

retainer, and wire reel from hub.

 

 

 

 

 

To install wire lay wire reel on flat

 

 

 

 

 

 

 

 

 

 

 

 

surface and install wire as shown.

Unlocked

 

 

 

 

 

Tighten spanner nut until lock is in

 

 

 

 

 

 

position over hole in wire retainer.

 

 

 

 

 

 

Pull lock and turn to insert locking

 

 

 

 

 

 

pin into wire retainer.

 

 

 

 

 

7

Slide wire reel assembly onto hub.

 

 

 

 

 

Turn assembly until hub pin is

 

 

 

 

 

 

 

 

 

 

 

 

seated in hole in reel. Reinstall

 

 

 

 

 

 

retaining ring.

3

4

5

6

Wire Installation

ST-161 000-A / ST-152 463 / Ref. ST-157 999-A

SECTION 3 – OPERATION

3-1. Safety Equipment

 

 

 

Wear the following while welding:

 

 

 

1

Dry, Insulating Gloves

 

 

 

2

Safety Glasses With Side

1

2

3

 

Shields

3

Welding Helmet With Correct

 

 

 

 

 

 

 

Shade Of Filter (See ANSI

 

 

 

 

Z49.1)

sb3.1 1/94

OM-884 Page 17

Page 21
Image 21
Miller Electric A.B.B. Robot Interface Gas Control Hub And Spindle manual Operation, Installing Optional Reel-Type Wire