Mitsubishi Electronics MIM-A01 manual Operation, MIM-G01, Mitsubishi Electric

Models: MIM-G01 MIM-A01

1 62
Download 62 pages 62.65 Kb
Page 22
Image 22
5 Operation

MIM-G01

Operation

 

 

5 Operation

If you have followed the steps in the chapters 3 and 4, your modem is ready for operation.

5.1MIM-G01

The MIM-G01 presents two LEDs, which indicate the devices current operating mode. After the power supply has been switched on, a self test will be executed. The end of this test is indicated by a acoustic signal (short beep). After the test, the device tries to make a connection to the GSM network. The green LED will flash slowly when the log in was successful..

5.2MIM-A01

The MIM-A01 presents five LEDs, which indicate the devices current operating mode. After the power supply has been switched on, a self test will be executed. The end of this test is indicated by a acoustic signal (short beep).

 

 

 

 

 

 

SUPER MODEM

 

 

 

 

 

 

 

 

56k

 

 

 

 

DC 10...30V

Service Mail in

Mail out Modem Mode

 

 

 

 

-

+

Power

Line

COM1 (RS232)

DC 10...30V

Service

Mail in

 

Mail out

Modem Mode

 

-

+

Power

Line

 

COM1 (RS232)

Fig. 5-1:

LEDs on MIM-A01

 

 

 

 

Power

Mail in

Line

Mail out

Modem Mode

(yellow)

(red)

(green)

(yellow)

(red)

 

 

 

 

 

Starting self test

Testing LEDs

Testing memory

Flashes

Modem is fully operational

Duration: approx.

12 sec

Tab. 5-1:LEDs during the self-test

5 - 1

MITSUBISHI ELECTRIC

Page 22
Image 22
Mitsubishi Electronics MIM-A01 manual Operation, MIM-G01, Mitsubishi Electric