OPERATING PROCEDURE

PHOTOS

2. Removing the electronic control P.C. board, the

Photo 3

power monitor receiver P.C. board, i-see Sensor,

 

SW P.C. board and the terminal block

 

(1)Remove the horizontal vane, the panel (Refer to 1.) and the corner box.

(2)Remove the screw of the V.A. clamp, and then the indoor/outdoor connecting wire.(See Photo 3.)

(3)

Remove the switch holder from the electrical cover.

 

 

 

(See Photo 4.)

Screws of

 

(4)

Remove the screw of the electrical cover, and then the

the terminal

 

 

electrical cover. (See Photo 4.)

block cover

 

(5)

Remove the ground wire connected to the indoor electronic

 

 

 

control P.C. board from the electrical box. (See Photo 5.)

 

 

(6)

Unhook the power monitor receiver P.C. board holder from

 

 

 

the catch. (See Photo 5.)

 

 

(7)

Open the rear cover of the power monitor receiver P.C.

Drain hose

Screw of the V.A. clamp

 

board holder and pull out the power monitor receiver P.C.

 

 

 

 

board.

 

 

(8)

Remove the screws of the i-see Sensor cover and the i-see

 

 

 

Sensor motor, and then the i-see Sensor motor.

Photo 4

 

(9)Open the i-see Sensor holder and pull out the i-see Sensor.

(10)Open the switch holder and pull out SW P.C. board.

(11)Pull the electronic control P.C. board slightly toward you

 

from the electrical box, and disconnect TAB3 and all the

 

 

connectors on the electronic control P.C. board.

 

 

(LD101 and LD105 are direct-mounted to the electronic

 

 

control P.C. board.)

Switch holder

(12)

Pull out the electronic control P.C. board from the electrical

 

box.

 

(13)

Remove the ground wire connected to the heat exchanger

 

 

from the electrical box. (See Photo 5.)

Screw of the

(14)

Unhook the catches of the electrical box, and pull out the

electrical cover.

 

electrical box.

 

(15)Remove the screws of the terminal block cover, and then the terminal block cover and the terminal block holder. (See Photo 3.)

(16)Remove the terminal block by sliding it.

 

Photo 5

Fan motor

 

Ground wires

 

 

connector (CN211)

3. Removing the electrical box

 

Connector of the

(1) Remove the horizontal vane, the panel (Refer to 1.) and the

 

interlock switch(Fan)

 

(CN1R1)

corner box.

 

 

 

(2) Remove the screw of the V.A. clamp, and then the indoor/

 

Indoor coil thermistor

outdoor connecting wire.(See Photo 3.)

 

 

connector (CN112)

(3) Remove the switch holder and the electrical cover.

 

 

 

(See Photo 4.)

 

Connector of the

(4) Remove the ground wire connected to the heat exchanger

 

plasma power

from the electrical box.(See Photo 5.)

 

P.C.board(CN1T1)

 

 

(5) Disconnect the following connectors on the electronic

 

Connector of the

control P.C. board; the fan motor connector <CN211>, the

 

safety device(Plasma

indoor coil thermistor connector <CN112>, the vane motor

 

unit) (CN1T2)

connector <CN151>, the connector of the interlock switch

 

Vane motor

(Fan) of the horizontal vane <CN1R1>, the connector of

 

connector (CN151)

the safety device (plasma unit) <CN1T2>, the connector of

 

 

the plasma power P.C. board <CN1T1>, the connector of

 

 

the front panel driving motor <CN1U1>.

 

Connector of the

(6) Unhook the catches of the electrical box, and pull out the

 

front panel driving

electrical box. (See Photo3.)

Power monitor

motor (CN1U1)

 

receiver P.C. i-see Sensor

 

board holder

i-see Sensor

 

 

cover

32

Page 32
Image 32
Mitsubishi Electronics MSZ-FA25VA, MSZ-FA35VA service manual Operating Procedure Photos, Removing the electrical box