OPERATING PROCEDURE

 

PHOTOS

6. Removing the horizontal vane motor

Photo 9

 

 

Screws of the horizontal

 

(1)

Remove the nozzle assembly.(Refer to 4.)

 

 

vane motor unit cover

 

(2)

Remove the screws of the horizontal vane motor unit, and

 

 

 

 

 

 

 

 

 

pull out the horizontal vane motor unit.

 

 

 

(4)Remove the screws of the horizontal vane motor unit cover.

(5)Remove the horizontal vane motor from the horizontal vane motor unit.

(3) Disconnect the connector from the horizontal vane motor.

Screws of the horizontal vane motor unit

7. Removing the indoor fan motor and the line flow fan Photo 10

(1)Remove the panel (Refer to 1.) and the corner box.

(2)Remove the sensor holder, the power monitor receiver P.C.

 

board holder, the electrical box (Refer to 3.) and the nozzle

 

 

Motor band

 

assembly (Refer to 4.).

 

 

 

 

(4)

Remove the screws fixing the motor bed. (See Photo 10)

 

(5)

Loosen the screw fixing the line flow fan. (See Photo 11)

 

(6)

Remove the motor bed together with fan motor and motor

 

 

 

band.

 

 

(7)

Release the hooks of the motor band. Remove the motor

 

 

 

Screws of

 

band. Pull out the indoor fan motor.

 

 

 

the motor bed

(8)

Remove the indoor coil thermistor from the heat exchang-

 

 

er.

 

 

(w) Install the indoor coil thermistor (RT12) in its former posi-

 

 

 

tion when assembling it. (Refer to Photo 13)

 

 

(9)

Remove the screws fixing the left side of the heat

 

 

 

exchanger. (See Photo 12)

Photo 11

(10)Lift the heat exchanger, and pull out the line flow fan to the lower-left.

Photo 13

Screw of

the line flow fan

Photo 12

Indoor coil thermistor (RT12)

Screws of the left side of the heat exchanger

39

Page 39
Image 39
Mitsubishi Electronics MSZ-FD25VAS, MSZ-FD35VAS service manual Removing the horizontal vane motor Photo