installation for vertical termination

ventING installation

Designer Series Gas Fireplaces

installation for vertical termination

1.Determine the route your vertical venting will take. If ceiling joist, roof rafters or other framing will obstruct the venting system, con- sider an offset. Refer to Figure 32 to avoid cutting load bearing members.

NOTE: Pay special attention to these installation instructions for required clearances (air space) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, etc. Do not pack air spaces with insulation. Also note maximum vertical rise of the venting system and any maximum horizontal offset limitations. Offsets must fall within the parameters shown on Page 20, Figure 22.

2.Set fireplace in desired location. Drop a line plumb down from the ceiling to the position of the flue exit. Mark the center point where the vent will penetrate the ceiling. Drill a small locating hole a this point.

Drop a plumb line from the inside of the roof to the ceiling locat- ing hole in the ceiling. Mark the center point where the vent will penetrate the roof. Drill a small locating hole at this point.

flat ceiling installation

1. Cut a 9Z\x" (241 mm) square hole in the ceiling using the locating

hole as a center point The opening should be framed to 9Z\x" x 9Z\x"

(241 x 241 mm) inside dimensions as shown in Figure 33 using

framing lumber the same size as the ceiling joist. If the area above

the ceiling is an insulated ceiling or a room, nail firestop from the

top side. This prevents loose insulation from falling into the required

clearance space. Figure 33. Otherwise, install firestop below the

framed hole.

2. Assemble the desired lengths of pipe and elbows necessary to

reach from the burner system flue up through the firestop. Be

sure pipe and elbow connections are fully twist-locked. Page

18, Figure 18

Roof

Flashing

Wall Strap

45° Elbows

FP1669

flat ceiling installation Ceiling Firstop

Figure 32 -

Offset with Wall Strap and 45° Elbows

Nails

3. Cut a hole in the roof using the locating hole as a center point.

(Cover any exposed open vent pipes before cutting hole in

roof). The 9Z\x" x 9Z\x" (241 x 241 mm) hole must be measured

Firestop

Figure 33 -

FP1969

on the horizontal. Actual length may be larger depending on

the pitch of the roof. There must be a 1" minimum clearance

from the vent pipe to combustible materials. (Insulation should

be considered a combustible material) Frame the opening as

shown on Page 18, Figure 17.

If area above is a room, install firestop above framed hole as shown

 

 

 

 

 

9

 

 

 

 

 

"

1

 

 

 

/

 

/

 

 

 

 

 

2

9

1

 

2

 

 

"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FP1970

Figure 34 -

Nails

Firestop

 

 

 

If area above is not a room, install firestop below framed hole as shown

42D0200